Free on-site gate assessment - hinges, posts, and your LiftMaster or Nice gate operator checked before anything is quoted
The assessment is free and the quote is the invoice.
FAAC Welding & Fabrication: The Concord Owner’s Guide
FAAC welding and fabrication repair in Concord typically runs $340-$780 installed, depending on whether we’re rebuilding an existing arm bracket, fabricating a new gate hinge assembly, or repairing a damaged FAAC 415 or 770 series operator mount. We stock common FAAC mounting plates, arm brackets, and hinge hardware on our trucks, and most welding repairs on FAAC-equipped gates are completed same-day. Most Concord homeowners discover the problem when their swing or slide gate starts catching at the same point in its travel, or when they notice fresh rust weeping from a cracked weld at the operator mounting plate.
Which FAAC Models This Applies To
The welding and fabrication work we do on FAAC systems in Concord centers on three operator families: the 400 series (415, 422, 402 SBS), the 700 series (770, 741, 844), and the S800 hydraulic swing-gate operators. Each mounts differently, and the bracket geometry is not interchangeable between series.
The 400 series uses a cast aluminum bracket that bolts to a steel mounting plate welded to the gate post or pillar. That plate takes the full cantilever load of the operator arm, and in Concord’s clay-heavy soils, post settling cracks the weld at the plate-to-post joint. The 700 series uses a heavier boxed steel frame that often needs gusset reinforcement after years of cycle stress. The S800, being hydraulic, mounts on a fabricated hinge assembly that can twist if the gate leaf sags.
To identify your FAAC model, check the silver data label on the operator body, not the remote or control board. The part number format is typically FAAC followed by four digits. For mounting hardware, measure the post diameter and the operator arm reach, because FAAC sells at least three post-adapter diameters per series and ordering wrong means a second trip. We carry both OEM FAAC mounting kits and fabricated equivalents made from 3/16-inch hot-rolled steel with zinc-rich primer, which outlasts the standard powder coat in Concord’s winter moisture.
We are an independent service provider, not affiliated with FAAC.
Signs Your FAAC Welding & Fabrication Is Failing

- The gate catches at the same point every cycle. A cracked or shifted mounting plate changes the operator’s geometry by even a quarter-inch, and the arm binds at full extension. In the older neighborhoods near Todos Santos Plaza, we’ve traced this to original 1980s weld plates that were never galvanized and have finally rusted through at the hidden back side.
- Fresh rust streaks below the operator mount. Rust weeping from a weld joint means moisture has breached the paint film and is working the steel from inside. On FAAC 415 installations with painted steel posts, this usually starts where the mounting plate meets the post, because that joint is impossible to prep properly during original installation.
- The operator arm makes a popping sound at startup. That pop is the bracket flexing before the gate moves. It means the weld or bolt pattern has loosened, and the arm is taking a running start against a moving target. Left alone, it strips the internal gears.
- The gate leaf has dropped visibly. A sagging leaf overloads the operator because the arm is no longer pushing through its designed arc. The root cause is often a failed hinge pin or a cracked hinge box, both of which we fabricate on-site rather than waiting for a FAAC backorder.
- The mounting plate bolts spin freely. Spinning bolts mean the weld nuts inside the post have broken loose, which happens when the plate flexes repeatedly. We cut open the post, re-weld the nut plates, and seal the access with a fabricated cover plate that matches the original profile.
Before
AfterReplacement Cost & What’s Included
| Service | Typical Range in Concord | What’s Included |
|---|---|---|
| Mounting plate weld repair | $340-$480 | Cut, grind, re-weld, prime, paint match |
| Fabricated replacement mounting plate | $420-$620 | Custom-cut 3/16″ steel, welded, primed, installed |
| Hinge pin / hinge box rebuild | $380-$550 | Pin turning, bushing fabrication, weld repair |
| Full operator relocation / new post mount | $580-$780 | New plate, post reinforcement, re-level, limit reset |
What drives the range: post material (steel tube vs. masonry), whether we can weld in place or must remove the gate leaf, and whether the FAAC operator itself needs limit-switch recalibration after the geometry changes. Every price is written and handed to you before we strike an arc. Under Clause 1 of The Haven Standard, the flat price you sign is the price on the invoice. The 365-Day Done Right Promise covers all welding and fabrication work, and we photograph every weld, every bolt torque, and every limit-switch reading before we leave.
DIY or Call Us?

There’s a short list of checks that won’t hurt you: confirm the gate isn’t obstructed, verify the FAAC disconnect handle is fully engaged, and look for obvious bolt looseness at the mounting plate. Do not attempt to weld a loaded gate post or repair a cracked operator bracket yourself. The gate leaf is under significant weight, and cutting or heating a stressed weld can release that load unpredictably. We have pulled twisted brackets off posts where a homeowner’s repair held for two weeks before the fresh weld sheared and the 300-pound leaf dropped free.
We also don’t recommend grinding and re-painting a rusted mounting plate without pulling the operator. The hidden back side is where the real damage lives, and FAAC operators are not light. If you’re in Concord and seeing any of the symptoms above, call (510) 726-7050. We’ll give you a written price for the repair, and if you have another company’s estimate already, we’ll review it free under our second-opinion policy.
FAQs
Properly welded and primed mounting hardware lasts 12-18 years in Concord, though the winter moisture and clay soil movement near the Diablo Valley shorten that to 8-12 years on posts that weren’t originally galvanized. We use zinc-rich primer on every fabrication repair to push that toward the longer end. Call (510) 726-7050 if you’re seeing rust now - catching it early means repair, not full replacement.
Most plates can be repaired if the crack is less than three inches and hasn’t propagated into the bolt hole pattern. We grind to clean metal, weld with 7018 rod for ductility, and add a gusset plate if the crack runs toward a stress concentration. If the plate has been repaired before or the bolt holes are wallowed out, we fabricate a new one. The inspection and recommendation are free.
Most repairs run two to four hours on-site, including setup, welding, cooling, priming, and re-hanging the operator. Full operator relocations or post replacements take a full day because the concrete must set before we tension the gate. We stock common FAAC mounting hardware, so we’re not waiting on parts.
We carry 3/16-inch and 1/4-inch hot-rolled steel plate, common FAAC post adapters, hinge pins, bushings, and welding consumables on every truck. For specialized FAAC cast brackets that can’t be fabricated, we source OEM or equivalent through our supplier and schedule the repair once the part arrives. We’ll tell you exactly which path applies when we see the gate.
Written by Adrian Vance, Owner, Vance Gate Repair Concord at Vance Gate Repair Concord, serving Concord and nearby areas.





Before
After
Before
After